Projects
You are here: Home : Projects : Portfolio : Environmental
Document Actions

Clarice Smith Stormwater Management Pond

 

Client:University of Maryland at College Park
Location:College Park, Md.
Services:Stormwater management, structural engineering, water resources, surveys, geotechnical engineering, wetland delineations and permitting, construction inspection

KCI prepared design plans to retrofit an existing stormwater management pond at the entrance to the Clarice Smith Performing Arts Center. The pond is located on a major campus entrance near the university president's house. The retrofit design improved the pond’s aesthetics and performance, and removed the need for two retaining walls that were proposed as part of the pond’s original design but were never built. The pond now features forebays, permanent water pools and pathways, allowing the facility to be used as an educational tool by students.


Back to Projects