Projects
You are here: Home : Projects : Portfolio
Document Actions

Project Index

Alpha Ridge Solid Waste Management Center Transfer Station

Marriottsville, Md.

KCI prepared contract documents and construction oversight for a two-level, 500-ton-per-day municipal solid waste transfer station.

Baltimore County Neighborhood Statistical Profile Tool

Baltimore County, Md.

KCI assisted the county’s Local Management Board and Office of Information Technology in defining and developing a set of tools for performing data analyses on existing agency datasets using small geographic units.

Barbados Farmers’ Dam and Impoundment

Black Rock, St. Michael, Barbados

KCI explored the subsurface conditions of a proposed 24-foot high, 900-foot long dam embankment with a capacity of 500 million gallons.

Clarice Smith Stormwater Management Pond

College Park, Md.

KCI prepared design plans to retrofit an existing stormwater management pond at the entrance to the Clarice Smith Performing Arts Center.

Dredging Annapolis Harbor for Round-the-World Volvo Race

Annapolis, Md.

In an effort to meet the harbor depth requirements for the 2006 Volvo Ocean Race, KCI conducted a feasibility study and provided design and permitting services for dredging the Annapolis harbor.

Frederick County Street Centerline and Addressing

Frederick County, Md.

KCI designed and implemented an integrated addressing and street centerline data system to support the county’s 911 dispatch, emergency response, school bus routing, planning and development and infrastructure management activities.

George Creek Stream Relocation

Plainfield, Ind.

KCI provided planning, engineering and construction oversight services for the relocation of 5,000 linear feet of stream channel on an 82-acre site.

Goddard Space Flight Center Environmental Compliance

Greenbelt, Md.

Under a $1 million indefinite quantity contract for environmental services, KCI provided numerous environmental compliance services for the proposed expansion of the 1,270-acre Goddard campus.

I-70/Six Points Stream Relocation

Indianapolis, Ind.

As part of the team building a new interchange connecting I-70 to a new terminal at nearby Indianapolis International Airport, KCI provided peer review and channel relocation design services for more than 2.6 miles of stream.

James Senate Office Building

Annapolis, Md.

KCI provided industrial hygiene monitoring and air sampling during the renovation of the historic James Senate Office Building, the first building to house offices for the Maryland State Senate.

Archaeological Excavations at Leetsdale

Leetsdale, Pa.

KCI performed excavation, analysis and report preparation for an archaeological data recovery located at the Leetsdale Industrial Park along the Ohio River.

Montour Run Conservation and Land Use Plan

Allegheny County, Pa.

KCI developed a river conservation and land-use plan for the 37-square-mile Montour Run Watershed.

Maryland State Highway NPDES Website

Statewide, Md.

KCI developed and hosted a comprehensive Internet-based application to facilitate the rapid retrieval of the extensive amount of data created by the statewide NPDES compliance program.

Mattawoman Wastewater Treatment Plant

Charles County, Md.

KCI provided planning, design and construction services for the expansion and upgrade of the largest Maryland facility discharging effluent into the Potomac River.

Patapsco Wastewater Treatment Plant ENR Upgrade

Baltimore, Md.

As part of a joint venture, KCI designed upgrade improvements for Enhanced Nutrient Removal for the Patapsco Wastewater Treatment Plant.

Smyrna Water Tank and System Analysis

Smyrna, Del.

As town engineer, KCI analyzed the performance and capacity of the town’s existing water system, developed a financial pro forma to evaluate water and sewer rate structures, and prepared construction documents for a new 750,000-gallon elevated water tank.

South Bethany Tidal Pump

South Bethany, Del.

KCI evaluated and further developed a tidal pump concept to alleviate water quality problems in the town’s inland canal system.

Stoney Creek Local Watershed Plan – Phase IV Implementation

Goldsboro, N.C.

KCI lead the development of the EEP’s first-ever Phase IV implementation of a local watershed plan.

Wilde Lake Dam Inspection

Columbia, Md.

Under a multi-year contract as the Columbia Association’s “Dam Owner’s Engineer,” KCI performed a structural and underwater inspection at Wilde Lake Dam.

Woodrow Wilson Bridge Fish Passage Program

Metropolitan Washington, D.C.

As part of the environmental mitigation program for the $2.4 billion Woodrow Wilson Bridge project, KCI developed and implemented a program to restore 26 miles of historic fish spawning habitat by removing or modifying 23 man-made barriers to fish passage in five major streams.