Project Index
14th Street Bridge Corridor EIS
Washington, D.C., and Arlington, Va.
KCI prepared an EIS for mobility improvements along the 14th Street Bridge Corridor, among the mostly heavily congested corridors in region.
Baltimore-Washington Magnetic Levitation Corridor
Baltimore, Md./Washington, D.C., Corridor
Since 1992, KCI has led teams studying and preparing planning and preliminary engineering documents for a magnetic levitation train along the Baltimore-Washington corridor.
Congress Heights Traffic Calming and Safety Study
Washington, D.C.
An innovative traffic calming program developed by the District and KCI is encouraging motorists to slow down and mind posted speed limits through the Congress Heights neighborhood.
Diving at Various Maryland Port Facilities
Baltimore, Md.
KCI provided on-call professional-engineer diving services to conduct inspections for various Maryland port facilities and marine terminals.
Dorsey Commuter Rail Station
Anne Arundel County, Md.
KCI provided planning, preliminary engineering and final design services for this new $4.2 million MARC commuter rail station.
Gettysburg Interchange
Cumberland County, Pa.
KCI led a multi-consultant team in replacing the Pennsylvania Turnpike’s Gettysburg Pike Interchange.
Gunn Highway Widening
Hillsborough County, Fla.
KCI provided surveying, engineering analysis, design and post-design services for 1.1 miles of multi-lane reconstruction.
Herbert C. Bonner Bridge Inspection
Dare County, N.C.
KCI conducted two biennial inspections of the 260-span, 2.5-mile long Bonner Bridge.
I-95/I-495/MD 210 Interchange
Prince George’s County, Md.
As part of the $2.4 billion Woodrow Wilson Bridge replacement project, KCI prepared design plans for reconstructing the I-95/I-495/MD 210 interchange.
MD 355 Interchange
Montgomery County, Md.
Commuters have an easier time making their way through Gaithersburg thanks to the connectivity created by the new MD 355 interchange, easing traffic flow for the more than 55,000 motorists that use the facility every day.
MD Route 70 over College and Weems Creeks
Annapolis, Md.
KCI's design transformed two bridges into a formal gateway to the colonial city of Annapolis, the Maryland state capital.
Middle Anacostia River Crossings Transportation Study
Washington, D.C.
KCI conducted a detailed transportation study for the Middle Anacostia area to identify long- and short-term improvements.
SR 0026, I-99 Limited Access Expressway
Centre County, Pa.
KCI prepared pre-final and final design plans for a 2.5-mile section of SR 0026.
Suwanee Pedestrian Bridge
Suwanee, Ga.
KCI provided engineering services for a 160-foot-long pedestrian bridge and elevated boardwalk linking Town Center Park with a multipurpose greenway.
Intercounty Connector - MD 200
Montgomery County, Md.
KCI was a member of two separate design-build teams working on segments of the 18-mile long, $2.5 billion Intercounty Connector (ICC) between I-95 and I-270.
US 98 (SR50/SR700) from SR 541 to East of Croom-Rital Road
Hernando County, Fla.
KCI provided engineering analysis and design services for resurfacing and reconstructing more than five miles of US 98.

