C.R. 581 (Bruce B. Downs Blvd.) from Bearss Avenue to South of Palm Springs Blvd. (Segment A)
Tampa, Florida
KCI is providing construction engineering and inspection services for the $35 million, 3.5-mile Bruce B. Downs (CR 581) Segment A roadway reconstruction. The project consists of widening the four-lane rural roadway to an eight-lane urban section and includes:
-
Courtesy of Aerial Innovations New sidewalks;
- multi-use path reconstruction;
- Cypress Creek Bridge replacement and widening;
- major side street connections;
- construction of drainage collection system;
- offsite storm drainage ponds;
- extensive water main (3,463 LF) and force main (19,405 LF) installation/relocation (for city of Tampa);
- coordination with private utilities;
- construction of retaining and gravity walls with handrails;
- curb and gutter;
- asphalt pavement;
- signing and pavement markings;
- removal of existing signalization;
- mast arm signal systems;
- new Intelligent Transportation System (ITS) infrastructure;
- master-plan landscape installation;
- Cork Prairie Wetland Creation project involving clearing and grubbing, excavation plus wetland; planting mitigation.