Close

Ash Boulevard Pump Station Upgrade

Middletown, DE

Client:
Town of Middletown
Markets:
Services:

KCI provided engineering services for the 1.5 MGD upgrade of an existing sub-surface dry well / wet well packaged pump station.

KCI performed hydraulic analysis, civil site, structural, mechanical, electrical and controls engineering services. The recommended improvements included replacement of the existing station with a wet well, three variable speed submersible pumps, odor control system, standby generator, harmonic filter, and explosive gas monitoring equipment.

The station upgrade included a new building for power distribution, system controls, and standby generator. Station alarms were transmitted over a peer to peer radio telemetry PLC controller system utilized to prioritize and coordinate regional pumping station operations to maximize conveyance system storage.